Atlas Steel Co. — Fabrication Capacity Build-Out

Location: United Arab EmiratesPeriod: Team-led facility programmeClient: Atlas Steel Co.

Scope

Modification of a UAE steel factory to expand tank-fabrication throughput, including transfer-car and tilting-device engineering.

Technical Details

  • Referenced fabrication capacity: 40,000–48,000 tonnes/year
  • 11,000 m² covered area on a 30,000 m² yard
  • 50-tonne capacity transfer cars
  • Patented tilting devices designed and fabricated in-house
Wide interior view of a steel fabrication workshop with overhead cranes and workers processing steel plate
Heavy-duty plate tilting machine handling a large steel plate under an overhead crane
CNC plasma plate cutting machine on rails inside a steel fabrication workshop
Welders fabricating large circular flanged nozzle covers on steel plates
Welder fabricating a cylindrical pressure vessel shell with flanged nozzles

This project represents prior professional experience of members of STECOO's engineering and leadership team before the incorporation of STECOO Steeltech Engineering & Construction Operations LLP on 29 June 2023.