Storage Tank Fabrication
STECOO designs, fabricates and supports the installation of steel storage tanks — from water storage tanks to large fixed and dome-roof process tanks — referenced against API 650, API 620 and AWWA standards. The engineering team brings direct, hands-on experience from large-capacity tank projects in Saudi Arabia and the UAE, including dome-roof erection using purpose-built lifting jacks and fixed-column-roof tank construction.
- 6
- Technical Capabilities
- 4
- Applications
- 7
- Process Stages
- 2
- Industries Served
Technical Capabilities
- Fabrication referenced to API 650, API 620 and AWWA standards
- Fixed-roof, dome-roof and open-top tank configurations
- Carbon steel and stainless steel construction
- Engineering-team experience with tanks up to 106 m diameter and referenced capacities up to 170,000 m³ on prior GCC projects
- Dome-roof lifting using purpose-designed hydraulic jacks
- Firefighting and water storage tank variants
Applications
- Water treatment and desalination plant storage
- Oil & gas process and product storage
- Industrial firefighting water reserves
- Bulk liquid storage for process industries
Engineering Process
- 01Site survey and storage requirement review
- 02Engineering calculations to the applicable tank standard
- 03CAD / detailed fabrication drawings
- 04Plate cutting, rolling and shell fabrication
- 05Roof fabrication (fixed, dome or floating as specified)
- 06Quality control checkpoints through fabrication
- 07Site installation, erection and roof lifting where scoped
Gallery




Frequently Asked Questions
Which standards do STECOO's storage tanks reference?
Tank engineering references API 650 (welded steel tanks for oil storage), API 620 (low-pressure storage tanks) and AWWA standards for water storage tanks, depending on the application and specification the client provides.
Can STECOO handle dome-roof and fixed-roof tanks?
Yes. The engineering team has direct experience with aluminum geodesic dome-roof erection using purpose-built lifting jacks, as well as fixed-column-roof steel tank construction.
Does STECOO install tanks on-site, or fabricate only?
Both — fabrication is carried out at STECOO's Visakhapatnam facility, and site installation is project-managed where the scope of work includes it, to minimise disruption at the customer's site.