STECOO
Engineering Team Experience — Prior to STECOO

Heavy Lifting — Surge Vessels

Location: GCC regionPeriod: Team engineering programme

Scope

Heavy lifting of surge vessels as part of mechanical installation scope.

Technical Details

  • Surge vessels handled at up to 150 tonnes each
Horizontal pressure vessels connected by insulated piping at an industrial site
Horizontal cylindrical pressure vessels installed at a desert industrial site

This project represents prior professional experience of members of STECOO's engineering and leadership team before the incorporation of STECOO Steeltech Engineering & Construction Operations LLP on 29 June 2023.